Schedule Properties Documentation



  1.  


  1. Descriptive Name that is visible on Tabs and Reports

  2. Company Production Location to determine Inventory Stock Transaction location.

  3. Company Production Location to determine Costing Transaction location.

  4. Number of days prior to starting production.

  5. Number of days to process Item.

  6. Number of days to include in ‘Immediate Subtraction’ column on Stocking Tab

  7. Schedule to be controlled by Confirming Items on this Schedule

  8. The Controlling Schedule that will automatically confirm items on this Schedule

  9. Person responsible for this Schedule

  10. Automatically Confirm Items on the Transfer Schedule when confirmed on this Schedule

  11. Obsolete (removed)

  12. Allows only finished good items (the top schedule tree item) on the schedule.

  13. This facilitates creating PO’s from the Schedule

  14. Self explanatory.

  15. Self explanatory.

  16. Self explanatory.

  17. Obsolete (removed)

  18. Obsolete (removed)

  19. Obsolete (removed)

  20. Self explanatory.

  21. Causes the due dates for items on the schedule to be after the due date of the top schedule tree item.

  22. Enable Drag-N-Drop by default

  23. Allows shipment creation at the time of run result entry. (Replaced with container tracking)

  24. Allows container creation at the time of run result entry. (Replaced with container tracking)

  25. Allows storage location (a field on Stock locations) editing at the time of run result entry. (Replaced with container tracking)

  26. Allows personnel to modify default Sub-Part quantities consumed on Production Ticket

  27. Size of Time Bucket Period

  28. Default Grouping Method on Schedule Tab

  29. Self explanatory.

  30. All schedule pool items for a given order will be shown in the same schedule period regardless of capacity settings.

  31. All schedule pool items for a given part will be shown in the same schedule period regardless of capacity settings.

  32. A conversion factor for converting between run Qty/time or $/time.

  33. Self explanatory.

  34. Use production dollar amounts for capacity measurements vs Use custom conversions (set up on the templates) to compute run times.

  35. Number of schedule copies to print. (The print dialog setting doesn't work.)

  36. Self explanatory.

  37. Print one schedule item per page

  38. Print a sticker for each produced piece